Arline Kitchen Remodel

More June 12

  • 7f995edabea59e6a1a6e3734f63966ad
    90% completed.
  • Abace24b479e35d02c3879974d01d386
    98% completed.
  • 970f75c8a5aecdfd098f152b4b5dd2a2
    Before pictures.
  • A4ede0e6ba9d91339c68f293cd58661e
    Upper and base cabinets installed. Appliances are now being install.
  • 8a4d9c9ff85fec6d89c9b87ee3bb0bad
    90% completed.
  • 82afd20a8c3159ad677b2b0f7d3b398d
    Before picture. Hole is from a ice dam in attic due to poor insulation and no overhang/soffit. Gutters were also filled with pine needles and haven't been cleaned in a few years.
  • 5a6bf2b75f3d46da3d2479c1e967c182
    Lower cabinets are one unit built in place.
  • A2371fac024a1ac291ac37204be151dd
    Testing out LED can lighting.
  • Eaafc9e0767579c0f536583884bc2090
    Bottom wall plate and underlayment dry rot.
  • 853308c1caa8fd7fcdf48996b808d41b
    After cabinet removal. Floor underlayment has water/dry rot damage.